The Learning Resource Centre (LRC) and
the link corridor to the hall
June/July 2001
Work started on the LRC, which will hold the school library.
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
|
| The LRC takes shape | |
![]() |
![]() |
![]() |
|
| The link corridor between the hall and the LRC is built. | |
| NEXT: Various work in July | |
![]()