Laying the junior classroom floors
February 2001
The concrete bases for the junior classroom
floors were laid.
Firstly the area was flattened and a plastic floor was laid.
![]() |
![]() |
| Next a wire mesh was put in to reinforce the concrete. | |
![]() |
![]() |
| Just
before the floors were laid, the steelwork for the building frame arrived. You can see the crane in this picture. |
|
![]() |
|
| NEXT: The steel framework | |
![]()