Work during the Easter holiday
April 2001
|
The boilerhouse was refitted. |
|
![]() |
![]() |
![]() |
|
|
The infant corridor started to take shape. |
|
![]() |
|
|
The infant classroom walls were built up. |
|
![]() |
![]() |
|
The library and year 2 classroom were stripped out. |
|
![]() |
![]() |
![]() |
![]() |
| NEXT: The infant side | |
![]()